|
Sl. No.
|
Project Title
|
Sponsoring
Agency
|
Amount
(in Lakhs)
|
Status
|
|
1
|
Subsidence Study of Khetri Copper Mine and Kolihan Copper Mine, Hindustan Copper Limited (HCL), Khetri Copper Complex (KCC), Rajasthan
|
HCL
|
97.94
|
On-going (CI)
|
|
2
|
Conducting a comprehensive scientific study of slope stability of working 04 nos of Pits & 05 nos. of. Dumps of F,G, D and Pantosh quarry areas of Bolani Ores Mines, SAIL-RSP and accordingly suggest the method of working, ultimate pit slope, dump slope and monitoring of slope stability in tune with the said study
|
RSP-SAIL
|
37.76
|
On-going (CI)
|
|
3
|
Scientific Study for the planning and Designing of method of working, ultimate pit slope, dump slope and slope stability by considering the FOS as per Reg 106(2) of CMR 2017 for Boria extension patch and sabanpur patch of Damagoria Colliery under Kalyaneswari OC of BCCL
|
BCCL
|
9.44
|
On-going (CI)
|
|
4
|
Scientific study for pit and dump slope stability for Khas Karanpura UG Coal Mines, CCL as per requirements of Regulation 106 of CMR,2017 and DGMS Guidelines
|
KKMPL
|
20.94
|
On-going (Co-CI)
|
|
5
|
Scientific Study and preparation of reports for the planning and designing of method of working, ultimate pit slope, dump slope and slope stability as per Reg 106(2) of CMR 2017 for Transdamoder Coal Mine of Durgapur Projects Limited
|
TDMPL
|
14.16
|
On-going (CI)
|
|
6
|
Slope Monitoring Study of South Kaliapani Chromite Mine and Sukrangi Chromite Mine of Odisha Mining Corporation Ltd.
|
OMC
|
53.10
|
On-going (Co-CI)
|
|
7
|
Scientific study for controlled blasting control blast design PROPOSED BOMMANALLI LIMESTONE BLOCK SITUATED AT VILLAGE BOMMANAHALLI, CHITTAPUR TALUK OF GULBARAGA DIST. KARNATAKA
|
Ramco Cement through Ecomen Lab
|
3.89
|
Completed (Co-CI)
|
|
8
|
Scientific Study for Determination of Method of Working, Ultimate Pit Slope, Dump Slope and Monitoring of Slope Stability at Jarangdih OCP, Kathara Area, CCL.
|
CCL, CIL
|
12.39
|
Completed (CI)
|
|
9
|
Detailed feasibility study for mining of Chandmari Intervening Block (CIB) deposit, Hindustan Copper Limited (HCL), Khetri Copper Complex (KCC)
|
HCL
|
34.94
|
Completed (Co-CI)
|
|
10
|
DGPS survey and preparation of geo-referenced cadastral map of Tumallapalle uranium mine of M/s UCIL.
|
UCIL
|
8.54
|
Completed (Co-CI)
|
|
11
|
DGPS survey and preparation of geo-referenced cadastral map of Gogi uranium mine of M/s UCIL at Yadgir district, Karnataka.
|
UCIL
|
4.50
|
Completed (Co-CI)
|
|
12
|
Six week course on Advances in Mine Surveying Technology
|
CIL, Tata Steel etc.
|
15.8
|
Completed (Co-CI)
|
|
13
|
Six week intensive course on " Advances in Mine Surveying Technology
|
CIL
|
124.56
|
Completed (Co-CI)
|
|
14
|
Six week intensive course on " Advances in Mine Surveying Technology
|
CIL
|
156.94
|
Completed (Co-CI)
|
|
15
|
Four Weeks Course On “Mine Surveying Techniques”
|
SECL
|
38.23
|
Completed (CI)
|